百度友情链接: 皇冠娱乐城(www.hygsb.com/bjl/hgylc/") 百家乐(www.fjlygd.com/a/bjl/) 皇冠网址(www.dfdzp.com/huangguanwangzhi/) 足球赔率(www.nbzsjy.com/zuqiupeilv/) 百利宫娱乐城(www.tmschool.net/bailigongyulecheng/) 赌博(www.wzypxw.com/dubo/) K7娱乐城(www.zjyxw.com/7yulecheng/) 太阳城娱乐城(www.hzwjfk120.com/futiantaiyangcheng/) 大发扑克(www.xndzj.com/dafapuke/) 真人斗地主(www.ahschy.com/zhenrendoudizhu/) 九州娱乐城(www.xtngzsb.com/jiuzhouyulecheng/) 重庆时时彩(www.lfqxj.com/zhongqingshishicaijiqiao/) 全讯网(www.yhwgx.com/全讯网/)
Thank you for your interest in
Taizhou Ucan Company. Please
use methods below to contact
us.
E-mail :  sales@ucanmould.com
                 
Skype :   Call me!

Add: 101,B Building,
DahuaJiayuang, HuangyanTaizhou, ZheJiang, China
TEL: 86-576-84408951
Fax: 86-576-84408952
Mob:0086-13656590159
You are here : Home > Work ProcessWork Process

Stage 1 : Part Design

At UCANMOULD we work with a team of well trained experienced designers for designing new parts/ articles as per the customs requirements. For this we require rough sketches along with dimensional measures or samples to prepare 2d and 3d drawings before planning the Molds designs.

Stage 2 : Molds Designs

Once the part drawings are confirmed our engineers work out a customised solution after studying the product material, Molds flow, desired strength of the article, weights and the desired production. The steel, Molds structure, relevant Molds design is planned and verified with the customer after which the Molds drawings and assembly drawings are prepared. With advanced CAD/CAM/CAE systems such as Pro-Engineer, Solid works, Unigraphics, Master CAM, Mold Flow, Auto CAD, in mold design we can offer drawings in latest formats. Usually we require 3 working days for providing the Molds drawings for approval.

Stage 3 : Molds Manufacturing

Once the Molds drawings are confirmed we strive for achieving high quality standards and reliable molds meant for high volumes of production with minimum maintenance required. With rich experience in developing various kinds of molds for a wide range of products we make accurate calculations keeping the costs as low as possible for our customers. We are familiar with hotrunner systems such as Yudo and DME which assist in avoiding runners, reducing cycle times and maintaining the consistency in the Moldsing during continuous production.

Stage 4 : Molds Trials : Quality & Inspection

For most of our molds we require 60 days for Molds manufacturing after which we conduct first trials before the molds go into analysis of the desired product, finishing, polishing, chrome plating and then for inspection. We conduct at least 3 trials before the molds are packed for shipment. Our Molds trials are conducted under supervision of experienced technical personnel who strive to avoid poor quality being passed on to the next stage of improvements. We also encourage our customers to visit the trials for their satisfaction.

Our molds are well painted, greased, Packed perfectly in the factory after which special care is taken for handling, storage and delivery to ensure customer satisfaction of their orders from first stage to final despatch.